Projects Completed
A comprehensive showcase of our drilling, construction, and water infrastructure projects across Tanzania.

Noravia Gold (Tanzania) Ltd
Gold exploration drilling project serving the Njombe region with precision borehole drilling and sample collection.

Sotta Mine Cooperation
Mining cooperation project delivering specialized drilling services in the Mwanza region.

Construction of Piped Water Supply at Sitalike Village
Complete piped water supply system construction for Sitalike Village in Simbo District Council, Katavi.

Construction of Piped Water System for Ihenje Village
Piped water system and civil works for Ihenje Village under contract LGA/143/2016/2017/W/12.

Construction of Gravity Water Supply Scheme at Isindagosi Village
Gravity-fed water supply scheme construction bringing clean water to Isindagosi Village in Njombe.

Construction of Piped Water Supply for Katsunga Village
Piped water supply construction for Katsunga Village in Nsimbo District Council.

Extension of Chemchem Water Supply to Chekeleni Village
Extension of Chemchem Water Supply Scheme to Chekeleni Village in Mtwara District, Mtwara Region.

Construction of Chitoholi Water Supply Scheme
Complete water supply scheme construction for Chitoholi serving the Tandahimba District community.

Rehabilitation of Dihimba Water Supply Project
Rehabilitation and upgrade of the Dihimba Water Supply Project in Mtwara District.

1200 Cubic Metres Water Tank Construction
Massive 1200 cubic metres water tank construction at Wang'ombe Njombe in Iringa Region.

Water Pumping House Station Construction
Water pumping house station construction at Wang'ombe Njombe, Iringa Region.

Water Tank Tower Construction
Elevated water tank tower construction in Mpanda, Katavi Region for improved water distribution.

Malatu Water Supply Scheme
Water supply scheme construction for Malatu community in Mtwara Region.

Box Culvert Construction
Box culvert construction projects for drainage and road infrastructure.

Rigid Pavement Construction
Rigid pavement construction for road projects requiring durable concrete surfaces.

Drilling at Stamigold Biharamulo
Monitoring borehole drilling at Stamigold Biharamulo mining site.

Drilling at RUWASA Misenyi Water Project
Borehole drilling and development for RUWASA Misenyi water project.

Dewatering at Bulyanhulu Gold Mine
Dewatering and depression borehole drilling at Bulyanhulu Gold Mine, Upper West Box Cut Project.

Upgrade of Suka Golani Road to Rigid Pavement
5.8km road upgrade to rigid pavement standard, improving durability and load-bearing capacity for heavy traffic.

Upgrade of Temeke, Kijichi, Mahonda Roads to Asphalt Standard
8.9km road upgrade to asphalt standard, enhancing road safety and accessibility for local communities.

Widening of Mjimwema Ferry Road in Asphalt Standard
Proposed widening and asphalt paving of Mjimwema Ferry Road to accommodate increased traffic flow and improve connectivity.

Construction of Ubungo Kibo Msewe Roads in Rigid Pavement
Construction of Ubungo Kibo Msewe roads using rigid pavement technology for long-lasting infrastructure.
Feasibility Study & Drilling 18 Productive Boreholes
Comprehensive feasibility study, detailed design, and drilling of 18 productive boreholes for water supply.
Have a Project in Mind?
Let's discuss how SEBA can deliver exceptional results for your next drilling or construction project.
Get in Touch
